The external lift has been manufactured from Marine grade stainless steel and coated to stay in keeping with the surroundings of the DAB David Attenborough Building. We had to overcome water retention issues at the base of the lift and carryout the installation through weekends as not to impact on the students
The internal lift had a unique issue given that we had to mount the structure to the curved face of the upper floor level